First step of demolition was to remove the window glass, to carefully remove a patio door that will be reused in the rebuilt home, and to prepare the area near the foundation which is intended to stay intact. Dogs Holly (left) and Chase (right) are curious but aren't alarmed. Chase is generally on the deck and Holly spends most of her time in the water. (I really need to get some photos and video of Holly swimming!) Our contractor Brian thought of everything, including protecting the awesome deck. Brian and Mitch are keeping the site immaculate and they've also added a nice sunshade roof over the picnic table on the deck.
0 Comments
Leave a Reply. |
Bogie Project BlogThis blog is dedicated to the loving memory of Glen Brownlee (d. June 19, 2018), a master of cottage projects, who was so looking forward to following our first cottage project, which is underway on Calabogie Lake, ON Posts
Most recent is first Dock Finally Spring Custom Table Finishing Interior Trim Kitchen Completed Kitchen and Much More Painting Siding Drywall Odds and Ends Roof Windows and Doors Great Progress Inside & Out More Framing Walls Building! Big Storm Septic System & Grading Foundation Starting Over D Day Demolition Prep Lumber Jack & Lumber Jill By the Water Calabogie Lake Project ALL Posts Archives
July 2019
|